    彩钢板房的吊装与安装!
    来源:http://www.jnsxcg.com  2019-01-08 15:11:19
    夹芯板的吊装办法很多,如汽车吊吊升、塔吊吊升、卷扬机吊升和人工提高等办法。对 厂房檐高不大的单层轻钢厂房可采用人工提高的简洁办法。 对办公楼檐高较大的修建可采用卷扬机提高的办法, 由于不用大型机械, 设备可灵敏移动到需要装置的地址,故而便利而又价低。
    There are many lifting methods for sandwich panel, such as lifting by car crane, tower crane, hoist and manual lifting. Simple method of manual improvement can be adopted for Single-storey light steel workshop with small eaves. The hoist can be used to improve the eaves of office buildings. Without large machinery, the equipment can be moved to the address where the device is needed sensitively, so it is convenient and cheap.
    彩钢板的装置
    Apparatus of coloured steel plate
    1)实测装置板材的实践长度, 按实测长度核对对应板号的板材长度, 需要时对该板材进 行剪裁。
    1) The actual length of the plate of the measuring device is checked according to the actual length of the corresponding plate number, and the plate is tailored when needed.
    2)将提高到作业面的板材按排板起始线放置,并使板材的宽度覆盖标志线对准起始线。 并在板长方向两头排出规划的结构长度。
    2) The sheets raised to the working surface are placed according to the starting line of the layout, and the width of the sheet is covered by the marking line to align with the starting line. The planned structural length is discharged at both ends of the board length direction.
    3)用紧固件紧固两头后,再装置第二块板,其装置次序为先自左(右)至右(左),后自下 而上。
    3) After fastening two ends with fasteners, the second plate is installed, and the device sequence is from left (right) to right (left), then from bottom to top.

    4)装置到放线标志点处, 复查板材装置的偏差, 当满意规划要求后进行板材的全面紧固。 不能满意要求时,应在下一标志段内调正,当在本标志段内可调正时,可调整本标志段后再 全面紧固。顺次全面打开装置。 5)装置夹芯板时,应挤密板间缝隙,当就位准确,仍有缝隙时,使用密封胶填充。 6)在紧固自攻螺丝时应把握紧固的程度,不可过度。 7)板的纵向搭接, 应按规划铺设密封条和设密封胶, 并在搭接处用自攻螺丝或带密封垫 的拉铆钉连接,紧固件应拉在密封条处。

    济南彩钢板房

    4) Installation to the marking point, check the deviation of the plate device, and tighten the plate completely after satisfying the planning requirements. If the requirement is not satisfied, it should be adjusted in the next sign section. When it can be adjusted in this sign section, it can be adjusted and then tightened completely. Open the device in turn. 5) When installing the sandwich board, the gap between the plates should be compacted. When the sealant is in place accurately and there are still gaps, it should be filled with sealant. 6) When tightening self-tapping screw, we should grasp the degree of tightening, not excessive. 7) Sealing strips and sealants shall be laid in accordance with the plan for the longitudinal lapping of the plate, and the lapping joint shall be connected by self-tapping screw or rivet with sealing pad. The fastener shall be pulled at the sealing strip.
    5、门窗装置: 1)在彩板围护结构中, 门窗的外廓尺度与洞口尺度为紧密配合, 一般应控制门窗尺度比 洞口尺度小 5mm 左右。过大的差值会导致装置中的困难。 2)门窗的方位一般装置在钢的墙梁上, 在夹芯板墙面板的修建中也有门窗装置在墙板上 的作法,这时应按门窗外廓的尺度在墙板上开洞。 3)门窗装置在墙梁上时,应先装置门窗四周的包边件,并使泛水边压在门窗的边缘内。 4)门窗就位并作暂时固定后应对门窗的笔直和水平度跋涉测量,无误后作固定。 5)装置完的门窗应对门窗周边作密封。
    5. Door and window device: 1) In the color panel enclosure structure, the external dimension of the door and window is closely related to the hole dimension. Generally, the size of the door and window should be controlled about 5 mm smaller than the hole dimension. Excessive difference will lead to difficulties in the device. 2) The orientation of doors and windows is generally installed on steel wall beams, and in the construction of sandwich panel wall panels, there is also the practice of doors and windows on the wall panels. At this time, holes should be made in the wall panels according to the scale of the external profile of doors and windows. 3) When the doors and windows are installed on the wall beams, the edge wrapping around the doors and windows should be installed first, and the flooding edge should be pressed in the edge of the doors and windows. 4) When the doors and windows are in place and temporarily fixed, the straightness and levelness of the doors and windows should be measured and fixed without error. 5) The doors and windows after installation shall be sealed around the doors and windows.
    6、泛水件装置 1)在彩板泛水件装置前应在防水件的装置处放出准线,如檐口线、窗上下口线等。 2)装置前检查泛水件的端头尺度,挑选搭接口处的合适搭接头。 3)装置泛水件的搭接口时应在被搭接处涂上密封胶,搭接后当即紧固。 4)装置泛水件至角落处时, 应按交接处的泛水件断面形状加工拐折处的接头, 以保证拐 点处有良好的防水作用和外观作用。 5)应特别注意门窗洞的泛水件转角处搭接防水口的相互结构办法, 以保证修建的立面外观作用
    6. Flooding device 1) Before the color board flooding device, the alignment line should be set out at the waterproof device, such as eaves line, upper and lower windows line, etc. 2) Check the end dimensions of flooding parts before installation and select suitable lap joints at lap joints. 3) Sealant should be applied to the lap joint of the flooding parts of the device, and the lap joint should be fastened immediately. 4) When the flooding parts of the device reach the corner, the joints at the inflection should be processed according to the cross-section shape of the flooding parts at the junction to ensure that the inflection points have good waterproof and appearance functions. 5) Special attention should be paid to the structural method of overlapping waterproofing openings at the corner of flooding parts of doors and windows to ensure the facade appearance of the construction.
    以上内容由济南彩钢板房厂家整理发布,更多相关内容可以点击我们的官网进行咨询:http://www.jnsxcg.com
    The above content is organized and published by Jinan color steel house manufacturer. More related content can be consulted by clicking on our official website: http://www.jnsxcg.com.